
Add to Cart
P20 P20H NAK80 Custom Precision Injection Molding ISO9001 Standard
Detailed Product Description
Plastic injection molding/ plastic injeciton molded parts
Material | ABS, PC, PC+GF, PC/ABS, PBT, PA6+GF, PA66+GF, PPS, PU, PP, PE, TPE, TPU, LCP, Ultem, etc |
No. of Cavities | 1 / 2 / 4 / 8 / Multi |
Mold steel | P20, P20H, 718H, NAK80, 1.2311, H13, 1.2344, 420SS, S136, S-7 and 1.2767 |
Qualified suppliers | Mold base and mold steel from LKM, ASSAB, THYSSEN and DAIDO Hot runner system from YUDO, MOLD-MASTER, HASCO, DME, HUSKY. |
Injection System | Cold runner/ Hot Runner/3-Plate |
Mould Life | 200,000-1,000,000 Cycles. |
Software | 3D Modeling: Pro/ENGINEER , SolidWorks, Unigraphics 2D Drawing: Auto-CAD, E-drawing |
Minimum tolerance | Mold tolerance 0.005 mm, Part tolerance 0.02 mm |
Our engineering follows up your project from beginning to end, with English communication.
The NTT team works with customers from the prototype stage, through the preproduction stage, and assists with and implements an efficient and effective production, logistics, and quality management process.
NTT experienced and degreed mechanical and plastic engineers work with customers’ engineering organizations as follows:
□ Assist in making the customers’ designs suitable for an effective injection molding solution
□ Provide mold design and mold structure recommendations
□ Provide plastic resin and other component recommendations
□ Work with customers’ personnel to establish critical part/assembly/product parameters, dimensions, and performance requirements, and ultimately the production, logistics, and QA/QC requirements
The NTT project team usually consists of a senior mold design/moldmaking resource, a senior molding/materials resource, and the project manager(engineer). Input is drawn from QA/QC and logistics as required.
For the specific customer project, our engineering’s job including:
□ Project management on a day-to-day basis
□ Send customer weekly report every week.
□ Coordinating the activities of operating departments and required subcontractors through project completion
□ Coordinate status meetings with customers’ organization as requested and required
Engineering & Design